top of page

Fight FM150
A roundabout at RR12 & FM150 and a new FM150 extension are not the solution to Dripping Springs traffic.
Home: Subscribe
No events at the moment
Home: Events List
Home: Blog2
Search


What Would the Southwest Connection Cost?
Planning-level estimate on the new 2026 alignment (~7.2 mi): mid ~$252M (~$35M/mi), range ~$146–$443M. Construction not funded.
Fight FM150
Sep 53 min read


Where Would the Water Come From for the Southwest Connection?
The Southwest Connection is still in design. Construction is not funded. There is still no public answer for where drinking water would come from for denser development along that corridor.
Fight FM150
Jul 255 min read


The Money Behind the Southwest Connection
How engineering firms fund Hays County officials who advance the road — and how those same firms get paid from public budgets.
Fight FM150
Jul 253 min read


Spring 2021 Virtual Open House Results
After analyzing the Spring 2022 Virtual Open House Results we decided to go back and analyze the Spring 2021 Virtual Open House Results....
Fight FM150
Jun 28, 20221 min read


Spring 2022 Virtual Open House Results
K. Friese & Associates hosted a Dripping Springs Southwest Connection Study Virtual Open House April 4th - 29th 2022. This is a period...
Fight FM150
Apr 30, 20221 min read
Improve FM150? Know the Facts!
Fact sheet for the Apr-7 open house at Dripping Springs Ranch Park.
Fight FM150
Apr 7, 20222 min read
Fight FM150 Newsletter - January 2022
Team Goal To protect our Hill Country way of life environment and ecology from unnecessary construction of roadways across unspoiled land...
Fight FM150
Jan 25, 20222 min read
bottom of page